Over the last 2 weeks there has been major work trenching and laying pipes for incoming water, outgoing sewage, and rainwater.
The plumber, Gary Parham, dug massive ditches with the backhoe. Here a worker is welding together the pipe coming out of the slab (foreground) with the pipe connected to the water main.
This is a picture of our water coming off the main. This is about 5 feet below the sidewalk.
This is a picture of our sewer pipe connecting to the large sewer under the middle of the street. The workers had to cut away a big chunk of street pavement, then burrow down about 15 feet! I was amazed at how deep it was.
Once the plumbers finished and back-filled their trenches, Greg's crew could come back and work on the walls. As of 10/30/12 they are about 3 feet high and the windows are roughed. This is Ella standing in her future room. She has been playing a game with gravel in her room.